top of page

Back to Holland Park

  • Writer: James Jones-Hughes
    James Jones-Hughes
  • Aug 10, 2017
  • 1 min read

Carrying out a level survey on floor joists today. Then setting out partitions for the first and second floors. Always a bit tricky setting up the Total Station on timber, but it's still pretty accurate. 


 
 
 

Комментарии


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2023 by Benchmark Site Engineering Services Ltd

Get a quote: 07950 955 727
bottom of page