top of page

NORTHAMPTON UNIVERSITY

Currently the largest Metsec Metframe job in the UK, will requiring the installation of 30,000 m2 of SFS.

We have been involved with the Metsec sub-contractor, surveying the transfer slab and setting out the Metsec frame on the first of five blocks at the Northampton University project.

Involving high precision surveying and setting out, this project has involved the use of data extracted from Autocad drawings being transferred onto the Robotic Total Station.

bottom of page