I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us

August 30, 2017

Taking over a job from another setting out provider today. Will check control stations and grid lines, then there's some monitoring of neighbouring buildings. 

Update: previous setting out approximately 300mm out! Oh dear best keep it quiet from the neighbours. 

August 29, 2017

Setting out holding down bolts today. Sorting out discrepancies between architects and structural engineer drawings. 

August 10, 2017

Carrying out a level survey on floor joists today. Then setting out partitions for the first and second floors. Always a bit tricky setting up the Total Station on timber, but it's still pretty accurate. 

August 9, 2017

It's back in Canning Town today setting out uplighters at various radii around a central manhole. Should look stunning when it's complete. 

August 2, 2017

This is what you call an interesting setting out project. A £1 million staircase in Hampstead. Amazing. 

August 1, 2017

It's gridlines in Camden today on a project right near the High Street. 

Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

December 28, 2018

October 1, 2018

March 3, 2018

January 11, 2018

December 15, 2017

November 28, 2017

November 24, 2017

November 17, 2017

Please reload

Recent Posts
Search By Tags
Featured Posts

Crossrail Liverpool Street

September 5, 2017

1/5
Please reload

Archive
Please reload

© 2023 by Benchmark Site Engineering Services Ltd

Get a quote: 07950 955 727